An application to approve an increase of an existing groundwater allocation of 23.46 million gallons per month (mgm) to 68.10 mgm from wells 2, 3, 5, 6 and 7 for public water supply. The increase in allocation will allow the docket holder to provide up to 1,000 gpm (44.64 mgm of water to Muhlenberg Township Authority through a proposed interconnection. The docket holder’s wells are completed in the Allentown, Epler and Ontelaunee Formations in the Lower Maiden Creek and Willow Creek Watersheds in Maidencreek Township, Berks County, Pennsylvania.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the 2025-Q4-21 Maidencreek Township Authority D-1991-058 CP-7 mailing list.
An application to approve an increase of an existing groundwater allocation of 23.46 million gallons per month (mgm) to 68.10 mgm from wells 2, 3, 5, 6 and 7 for public water supply. The increase in allocation will allow the docket holder to provide up to 1,000 gpm (44.64 mgm of water to Muhlenberg Township Authority through a proposed interconnection. The docket holder’s wells are completed in the Allentown, Epler and Ontelaunee Formations in the Lower Maiden Creek and Willow Creek Watersheds in Maidencreek Township, Berks County, Pennsylvania.
Contact Information
*Indicates Required Fields